How it works

Five steps to a price you can trust. Ten stages to a kitchen you can cook in.

No showroom guesswork, no lump-sum quote. Here is exactly what happens, in the order it happens.

  1. 01

    Requirement

    Tell us about your space, cooking habits and budget

  2. 02

    Design

    Get a validated layout that fits your kitchen

  3. 03

    Configure

    Choose materials, hardware and appliances

  4. 04

    Price

    Watch the total update in real time, tax included

  5. 05

    Order

    Approve, pay in milestones, and track to installation

The full journey

All ten stages, connected

Each stage hands off to the next with a validated output — nothing is re-guessed later.

1. Lead

1. Lead

You arrive with an idea and a rough budget. Two fields — name and phone — and we save your progress so you can pick up where you left off, on any device.

2. Requirement

2. Requirement

We ask the questions a good designer would: who cooks, how often, do two people cook at once, where does the water line sit. Nothing about SKUs yet.

3. Design

3. Design

The layout engine proposes templates that actually fit your room shape — Straight, L-Shaped, U-Shaped, Parallel or Island — with a second prep zone where it makes sense.

4. Configuration

4. Configuration

Shutters, carcass, hardware, countertop, appliances, accessories. Guided Mode shows options curated for your tier; Expert Mode unlocks the full catalogue.

5. Pricing

5. Pricing

Every change moves the number in front of you — cabinetry, hardware, appliances, countertop and installation as separate lines, with GST shown per category.

6. Quotation

6. Quotation

A line-item quotation you can share with your family for review. Your price is locked for 15 days, regardless of catalogue movement.

7. Approval

7. Approval

A designer reviews the configuration for buildability before you approve. Then a 25% advance opens the project.

8. Site verification

8. Site verification

A site engineer confirms your exact dimensions and records floor, lift and access conditions that may adjust installation pricing — in person, never guessed.

9. Production & installation

9. Production & installation

Procurement, factory production and installation, tracked milestone by milestone. Typically 4–5 weeks for Essential, 8–12 for Luxury.

10. Digital Kitchen Passport

10. Digital Kitchen Passport

At handover you get a permanent digital record of your exact kitchen — every product, warranty and care instruction, with a Need service? button attached.

Want to see this on your own kitchen?

Start designing

Kitchen Efficiency Score

Every configuration is scored against five kitchen zones

Storage, cooking, cleaning, prep and movement — the same five-zone principle professional kitchen designers use. You see the score before you approve, along with the changes that would raise it.

Score my kitchen
Storage88
Cooking84
Cleaning79
Prep81
Movement76

Sample score from the Suri family's Parallel kitchen in Vasant Kunj.