Step 1 of 8 · Space13% saved

Section A

Your space

Rough measurements are fine — a site engineer verifies everything before production. Add a utility or second kitchen if you have one.

Approximate size

Length × width × height, in feet.

Is an external wall available?

This decides whether we can duct the chimney outside or need a recirculating one.

Where are the doors and windows?

Tap the wall positions. Rough placement is enough — it keeps tall units away from openings.

Room plan

Is there an existing chimney opening?