Step 1 of 8 · Space100% saved
Section A
Your space
Rough measurements are fine — a site engineer verifies everything before production. Add a utility or second kitchen if you have one.
Approximate size
Length × width × height, in feet.
Is an external wall available?
This decides whether we can duct the chimney outside or need a recirculating one.
Where are the doors and windows?
Tap the wall positions. Rough placement is enough — it keeps tall units away from openings.
Room plan
Is there an existing chimney opening?